Hyperlite Solar will handle everything from our initial contact with you through servicing your account. The process of installing solar panels involves several key steps, from initial assessment to the actual installation and connection to the electrical system. Here is a breakdown of the solar panel installation process:

​

  1. Site Assessment and Design:

    • Initial Consultation: A solar installer will assess your property's suitability for solar panels. Factors such as roof orientation, shading, and available space are considered.

    • Energy Consumption Analysis: The installer will review your energy consumption patterns to determine the size and capacity of the solar system needed to meet your needs.

    • Customized Design: Based on the assessment, a customized solar panel system design is created, outlining the placement of panels, inverter location, and overall system configuration.

  2. Permitting and Approvals:

    • Permit Acquisition: The solar installation company will obtain the necessary permits from local authorities. This ensures compliance with building codes and regulations.

    • Utility Approval: Approval from the utility company may be required to connect the solar system to the grid. The installer will handle the paperwork and coordination with the utility.

  3. Material Procurement:

    • Solar Panel and Components: Once permits are secured, the installer will procure the solar panels, inverters, mounting hardware, and other necessary components. Quality components from reputable manufacturers are crucial for the system's longevity and performance.

  4. Installation:

    • Roof Preparation: The installation team will prepare the roof by securing mounting brackets or rails. For ground-mounted systems, a suitable foundation is prepared.

    • Panel Mounting: Solar panels are mounted on the brackets or rails using bolts and clamps. Proper spacing and alignment are crucial for optimal energy capture.

    • Inverter Installation: Inverters, which convert DC power from the panels to AC power usable in homes, are installed. Depending on the system design, inverters may be mounted on the roof or near the main electrical panel.

  5. Electrical Wiring:

    • Connection to Inverter: Wiring connects the solar panels to the inverters. DC wiring is typically used for this stage.

    • Connection to Electrical Panel: AC wiring connects the inverter to the main electrical panel, enabling the solar-generated electricity to be distributed throughout the home or fed back into the grid.

  6. System Testing and Commissioning:

    • Functionality Testing: The entire system is tested to ensure all components are functioning correctly. This may include checking voltage, current, and inverter performance.

    • Commissioning: The system is officially commissioned for operation. This may involve coordination with the utility for final inspections and approvals.

  7. Monitoring and Maintenance:

    • Monitoring System Performance: After installation, a monitoring system is set up to track energy production and system performance.

    • Routine Maintenance: While solar panels are generally low-maintenance, periodic inspections and cleaning may be recommended to ensure optimal efficiency and longevity.

    • ​

Is is important that your solar panel installation process is handled by trained and certified Hyperlite Solar professionals to ensure safety, compliance, and optimal system performance.